This archive is retained to ensure existing URLs remain functional. It will not contain any emails sent to this mailing list after July 1, 2024. For all messages, including those sent before and after this date, please visit the new location of the archive at https://mailman.ripe.net/archives/list/[email protected]/
Subject: [routing-wg]routing wg draft agenda v2 for RIPE 52
- Previous message (by thread): [routing-wg]Draft doc proposing Route Flap Damping Obsolesence
- Next message (by thread): [routing-wg]Re: AW: [db-wg] Draft Minutes of the RIPE 52 DB-WG meeting
Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
João Damas
Joao_Damas at isc.org
Tue Apr 25 11:11:18 CEST 2006
Updated agenda with new item F A- Administrativia - Minute taker - Previous minutes - Open actions - New co-chair discussion (chairs, 5 min) B- Update on Route Flap Damping obsoletion (Philip Smith, 5 min) C- Update on Route Aggregation BCP (Joao Damas, Mike Hughes, 5 min) D- Authorisation of "route:" objects in the DB (TBA, 15 min) E- CoS enabled BGP (David Ward, 45 min) F- routing authorization (Rudiger Volk, 15 min) an example of requirements for different levels? currently available kludges G- Charter discussion (chairs, 15 min, or as time permits) Z- Input from other working groups.
- Previous message (by thread): [routing-wg]Draft doc proposing Route Flap Damping Obsolesence
- Next message (by thread): [routing-wg]Re: AW: [db-wg] Draft Minutes of the RIPE 52 DB-WG meeting
Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]